Amal Padmu L P
Date: 04/09/2023

Work in progress | 99% Completed

95.00% Fertigation Room|95% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

100.00% Sump Tank|100% Completed

EB connection Pending

Amal Padmu L P
Date: 10/07/2023

Work in progress | 99% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

final Finishing works are ongoing

Attached images

img

Amal Padmu L P
Date: 03/07/2023

Work in progress | 99% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

final Finishing works are ongoing

Amal Padmu L P
Date: 26/06/2023

Work in progress | 99% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 19/06/2023

Work in progress | 99% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 12/06/2023

Work in progress | 99% Completed

95.00% Fertigation Room|95% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

100.00% Sump Tank|100% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 05/06/2023

Work in progress | 99% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 29/05/2023

Work in progress | 99% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Electrical work ongoing

Amal Padmu L P
Date: 21/05/2023

Work in progress | 97% Completed

0.00% Civil work for lamp post|0% Completed

99.00% Electrification|99% Completed

100.00% Sump Tank|100% Completed

95.00% Fertigation Room|95% Completed

Electrical works are ongoing

Attached images

img

Amal Padmu L P
Date: 15/05/2023

Work in progress | 93% Completed

95.00% Fertigation Room|95% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

100.00% Sump Tank|100% Completed

Electrical works are pending

Amal Padmu L P
Date: 07/05/2023

Work in progress | 93% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Electrical works are pending

Amal Padmu L P
Date: 02/05/2023

Work in progress | 88% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Electrical works are pending

Amal Padmu L P
Date: 24/04/2023

Work in progress | 88% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Electrical works are pending

Amal Padmu L P
Date: 17/04/2023

Work in progress | 87% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Electrical works are pending

Amal Padmu L P
Date: 11/04/2023

Work in progress | 87% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Electrical works are pending

Attached images

img

Amal Padmu L P
Date: 03/04/2023

Work in progress | 85% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Electrical works to be start

Amal Padmu L P
Date: 27/03/2023

Work in progress | 80% Completed

0.00% Civil work for lamp post|0% Completed

99.00% Electrification|99% Completed

95.00% Fertigation Room|95% Completed

100.00% Sump Tank|100% Completed

Construction of sump is completed

Attached images

img

Amal Padmu L P
Date: 21/03/2023

Work in progress | 76% Completed

95.00% Fertigation Room|95% Completed

100.00% Sump Tank|100% Completed

0.00% Civil work for lamp post|0% Completed

99.00% Electrification|99% Completed

Concrete work for sump (3rd lift completed)

Attached images

img

Amal Padmu L P
Date: 13/03/2023

Work in progress | 66% Completed

95.00% Fertigation Room|95% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

100.00% Sump Tank|100% Completed

Concrete work for sump (first lift)

Attached images

img

Amal Padmu L P
Date: 06/03/2023

Work in progress | 63% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Reinforcement work for sump is ongoing.

Attached images

img

Amal Padmu L P
Date: 27/02/2023

Work in progress | 57% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Sub main and main line works are completed. Head Unit works are pending due to the delay in civil works

Attached images

img

Amal Padmu L P
Date: 20/02/2023

Work in progress | 55% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Earth work excavation for the sump tank is ongoing.

Attached images

img

Amal Padmu L P
Date: 13/02/2023

Work in progress | 44% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

fixing of rolling shutter and windows are completed

Attached images

img

Amal Padmu L P
Date: 07/02/2023

Work in progress | 42% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Installation of windows and rolling shutter is ongoing

Attached images

img

Amal Padmu L P
Date: 31/01/2023

Work in progress | 41% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 24/01/2023

Work in progress | 41% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 19/01/2023

Work in progress | 41% Completed

95.00% Fertigation Room|95% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

100.00% Sump Tank|100% Completed

Informed contractor to complete the remaining works

Amal Padmu L P
Date: 27/12/2022

Work in progress | 41% Completed

95.00% Fertigation Room|95% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

100.00% Sump Tank|100% Completed

Instruction given to the contractor to complete the remaining works

GPS Cordinates

Latitude : 10.7359472

Longitude : 76.8445672

Accuracy : 20

Anu IT Admin
Date: 29/11/2022

Work in progress | 41% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Plastering work ongoing

Attached images

img

Amal Padmu L P
Date: 29/10/2022

Work in progress | 0% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Foundation works-100% Column casting -100% Roofslab casting -100% Brick work for wall -to be started

GPS Cordinates

Latitude : 10.6848827

Longitude : 76.8265059

Accuracy : 1100

Attached images

img

Amal Padmu L P
Date: 25/10/2022

Work in progress | 0% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Roof slab concrete completed

GPS Cordinates

Latitude : 10.6845842

Longitude : 76.8275872

Accuracy : 3000

Attached images

img

Amal Padmu L P
Date: 19/10/2022

Work in progress | 0% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Form work for roof slab

GPS Cordinates

Latitude : 10.6821985

Longitude : 76.839977

Accuracy : 920.8150024414062

Attached images

img

Amal Padmu L P
Date: 10/10/2022

Work in progress | 25% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

The curing period for the columns is completed and instructed the contractor has to restart the work.

Attached images

img

Amal Padmu L P
Date: 01/10/2022

Work in progress | 25% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Curing period completed for column

Attached images

img

Amal Padmu L P
Date: 26/09/2022

Work in progress | 25% Completed

100.00% Sump Tank|100% Completed

99.00% Electrification|99% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Casting of column is completed

GPS Cordinates

Latitude : 10.6839258

Longitude : 76.8283082

Accuracy : 3000

Attached images

img

Amal Padmu L P
Date: 17/09/2022

Work in progress | 25% Completed

99.00% Electrification|99% Completed

100.00% Sump Tank|100% Completed

0.00% Civil work for lamp post|0% Completed

95.00% Fertigation Room|95% Completed

Casting of colomn completed

Attached images

img

Amal Padmu L P
Date: 04/09/2023

Work in progress | 0% Completed

EB connection Pending

Amal Padmu L P
Date: 04/09/2023

Work in progress | 0% Completed

EB connection Pending

Amal Padmu L P
Date: 04/09/2023

Work in progress | 0% Completed

EB connection Pending

Amal Padmu L P
Date: 04/09/2023

Work in progress | 0% Completed

EB connection Pending

Amal Padmu L P
Date: 10/07/2023

Work in progress | 0% Completed

final Finishing works are ongoing

Attached images

img

Amal Padmu L P
Date: 10/07/2023

Work in progress | 0% Completed

final Finishing works are ongoing

Attached images

img

Amal Padmu L P
Date: 10/07/2023

Work in progress | 0% Completed

final Finishing works are ongoing

Attached images

img

Amal Padmu L P
Date: 10/07/2023

Work in progress | 0% Completed

final Finishing works are ongoing

Attached images

img

Amal Padmu L P
Date: 03/07/2023

Work in progress | 0% Completed

final Finishing works are ongoing

Amal Padmu L P
Date: 03/07/2023

Work in progress | 0% Completed

final Finishing works are ongoing

Amal Padmu L P
Date: 03/07/2023

Work in progress | 0% Completed

final Finishing works are ongoing

Amal Padmu L P
Date: 03/07/2023

Work in progress | 0% Completed

final Finishing works are ongoing

Amal Padmu L P
Date: 26/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 26/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 26/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 26/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 19/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 19/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 19/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 19/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 12/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 12/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 12/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 12/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 05/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 05/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 05/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 05/06/2023

Work in progress | 0% Completed

Finishing works are ongoing

Amal Padmu L P
Date: 29/05/2023

Work in progress | 0% Completed

Electrical work ongoing

Amal Padmu L P
Date: 29/05/2023

Work in progress | 0% Completed

Electrical work ongoing

Amal Padmu L P
Date: 29/05/2023

Work in progress | 0% Completed

Electrical work ongoing

Amal Padmu L P
Date: 29/05/2023

Work in progress | 0% Completed

Electrical work ongoing

Amal Padmu L P
Date: 21/05/2023

Work in progress | 0% Completed

Electrical works are ongoing

Attached images

img

Amal Padmu L P
Date: 21/05/2023

Work in progress | 0% Completed

Electrical works are ongoing

Attached images

img

Amal Padmu L P
Date: 21/05/2023

Work in progress | 0% Completed

Electrical works are ongoing

Attached images

img

Amal Padmu L P
Date: 21/05/2023

Work in progress | 0% Completed

Electrical works are ongoing

Attached images

img

Amal Padmu L P
Date: 15/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 15/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 15/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 15/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 07/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 07/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 07/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 07/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 02/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 02/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 02/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 02/05/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 24/04/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 24/04/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 24/04/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 24/04/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 17/04/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 17/04/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 17/04/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 17/04/2023

Work in progress | 0% Completed

Electrical works are pending

Amal Padmu L P
Date: 11/04/2023

Work in progress | 0% Completed

Electrical works are pending

Attached images

img

Amal Padmu L P
Date: 11/04/2023

Work in progress | 0% Completed

Electrical works are pending

Attached images

img

Amal Padmu L P
Date: 11/04/2023

Work in progress | 0% Completed

Electrical works are pending

Attached images

img

Amal Padmu L P
Date: 11/04/2023

Work in progress | 0% Completed

Electrical works are pending

Attached images

img

Amal Padmu L P
Date: 03/04/2023

Work in progress | 0% Completed

Electrical works to be start

Amal Padmu L P
Date: 03/04/2023

Work in progress | 0% Completed

Electrical works to be start

Amal Padmu L P
Date: 03/04/2023

Work in progress | 0% Completed

Electrical works to be start

Amal Padmu L P
Date: 03/04/2023

Work in progress | 0% Completed

Electrical works to be start

Amal Padmu L P
Date: 27/03/2023

Work in progress | 0% Completed

Construction of sump is completed

Attached images

img

Amal Padmu L P
Date: 27/03/2023

Work in progress | 0% Completed

Construction of sump is completed

Attached images

img

Amal Padmu L P
Date: 27/03/2023

Work in progress | 0% Completed

Construction of sump is completed

Attached images

img

Amal Padmu L P
Date: 27/03/2023

Work in progress | 0% Completed

Construction of sump is completed

Attached images

img

Amal Padmu L P
Date: 21/03/2023

Work in progress | 0% Completed

Concrete work for sump (3rd lift completed)

Attached images

img

Amal Padmu L P
Date: 21/03/2023

Work in progress | 0% Completed

Concrete work for sump (3rd lift completed)

Attached images

img

Amal Padmu L P
Date: 21/03/2023

Work in progress | 0% Completed

Concrete work for sump (3rd lift completed)

Attached images

img

Amal Padmu L P
Date: 21/03/2023

Work in progress | 0% Completed

Concrete work for sump (3rd lift completed)

Attached images

img

Amal Padmu L P
Date: 13/03/2023

Work in progress | 0% Completed

Concrete work for sump (first lift)

Attached images

img

Amal Padmu L P
Date: 13/03/2023

Work in progress | 0% Completed

Concrete work for sump (first lift)

Attached images

img

Amal Padmu L P
Date: 13/03/2023

Work in progress | 0% Completed

Concrete work for sump (first lift)

Attached images

img

Amal Padmu L P
Date: 13/03/2023

Work in progress | 0% Completed

Concrete work for sump (first lift)

Attached images

img

Amal Padmu L P
Date: 06/03/2023

Work in progress | 0% Completed

Reinforcement work for sump is ongoing.

Attached images

img

Amal Padmu L P
Date: 06/03/2023

Work in progress | 0% Completed

Reinforcement work for sump is ongoing.

Attached images

img

Amal Padmu L P
Date: 06/03/2023

Work in progress | 0% Completed

Reinforcement work for sump is ongoing.

Attached images

img

Amal Padmu L P
Date: 06/03/2023

Work in progress | 0% Completed

Reinforcement work for sump is ongoing.

Attached images

img

Amal Padmu L P
Date: 27/02/2023

Work in progress | 0% Completed

Sub main and main line works are completed. Head Unit works are pending due to the delay in civil works

Attached images

img

Amal Padmu L P
Date: 27/02/2023

Work in progress | 0% Completed

Sub main and main line works are completed. Head Unit works are pending due to the delay in civil works

Attached images

img

Amal Padmu L P
Date: 27/02/2023

Work in progress | 0% Completed

Sub main and main line works are completed. Head Unit works are pending due to the delay in civil works

Attached images

img

Amal Padmu L P
Date: 27/02/2023

Work in progress | 0% Completed

Sub main and main line works are completed. Head Unit works are pending due to the delay in civil works

Attached images

img

Amal Padmu L P
Date: 20/02/2023

Work in progress | 0% Completed

Earth work excavation for the sump tank is ongoing.

Attached images

img

Amal Padmu L P
Date: 20/02/2023

Work in progress | 0% Completed

Earth work excavation for the sump tank is ongoing.

Attached images

img

Amal Padmu L P
Date: 20/02/2023

Work in progress | 0% Completed

Earth work excavation for the sump tank is ongoing.

Attached images

img

Amal Padmu L P
Date: 20/02/2023

Work in progress | 0% Completed

Earth work excavation for the sump tank is ongoing.

Attached images

img

Amal Padmu L P
Date: 13/02/2023

Work in progress | 0% Completed

fixing of rolling shutter and windows are completed

Attached images

img

Amal Padmu L P
Date: 13/02/2023

Work in progress | 0% Completed

fixing of rolling shutter and windows are completed

Attached images

img

Amal Padmu L P
Date: 13/02/2023

Work in progress | 0% Completed

fixing of rolling shutter and windows are completed

Attached images

img

Amal Padmu L P
Date: 13/02/2023

Work in progress | 0% Completed

fixing of rolling shutter and windows are completed

Attached images

img

Amal Padmu L P
Date: 07/02/2023

Work in progress | 0% Completed

Installation of windows and rolling shutter is ongoing

Attached images

img

Amal Padmu L P
Date: 07/02/2023

Work in progress | 0% Completed

Installation of windows and rolling shutter is ongoing

Attached images

img

Amal Padmu L P
Date: 07/02/2023

Work in progress | 0% Completed

Installation of windows and rolling shutter is ongoing

Attached images

img

Amal Padmu L P
Date: 07/02/2023

Work in progress | 0% Completed

Installation of windows and rolling shutter is ongoing

Attached images

img

Amal Padmu L P
Date: 31/01/2023

Work in progress | 0% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 31/01/2023

Work in progress | 0% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 31/01/2023

Work in progress | 0% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 31/01/2023

Work in progress | 0% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 24/01/2023

Work in progress | 0% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 24/01/2023

Work in progress | 0% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 24/01/2023

Work in progress | 0% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 24/01/2023

Work in progress | 0% Completed

Informed the contractor to complete the remaining works

Amal Padmu L P
Date: 19/01/2023

Work in progress | 0% Completed

Informed contractor to complete the remaining works

Amal Padmu L P
Date: 19/01/2023

Work in progress | 0% Completed

Informed contractor to complete the remaining works

Amal Padmu L P
Date: 19/01/2023

Work in progress | 0% Completed

Informed contractor to complete the remaining works

Amal Padmu L P
Date: 19/01/2023

Work in progress | 0% Completed

Informed contractor to complete the remaining works

Amal Padmu L P
Date: 27/12/2022

Work in progress | 0% Completed

Instruction given to the contractor to complete the remaining works

Amal Padmu L P
Date: 27/12/2022

Work in progress | 0% Completed

Instruction given to the contractor to complete the remaining works

Amal Padmu L P
Date: 27/12/2022

Work in progress | 0% Completed

Instruction given to the contractor to complete the remaining works

Amal Padmu L P
Date: 27/12/2022

Work in progress | 0% Completed

Instruction given to the contractor to complete the remaining works

Anu IT Admin
Date: 29/11/2022

Work in progress | 0% Completed

Plastering work ongoing

Attached images

img

Anu IT Admin
Date: 29/11/2022

Work in progress | 0% Completed

Plastering work ongoing

Attached images

img

Anu IT Admin
Date: 29/11/2022

Work in progress | 0% Completed

Plastering work ongoing

Attached images

img

Anu IT Admin
Date: 29/11/2022

Work in progress | 0% Completed

Plastering work ongoing

Attached images

img

Amal Padmu L P
Date: 29/10/2022

Work in progress | 0% Completed

Foundation works-100% Column casting -100% Roofslab casting -100% Brick work for wall -to be started

Attached images

img

Amal Padmu L P
Date: 29/10/2022

Work in progress | 0% Completed

Foundation works-100% Column casting -100% Roofslab casting -100% Brick work for wall -to be started

Attached images

img

Amal Padmu L P
Date: 29/10/2022

Work in progress | 0% Completed

Foundation works-100% Column casting -100% Roofslab casting -100% Brick work for wall -to be started

Attached images

img

Amal Padmu L P
Date: 29/10/2022

Work in progress | 0% Completed

Foundation works-100% Column casting -100% Roofslab casting -100% Brick work for wall -to be started

Attached images

img

Amal Padmu L P
Date: 25/10/2022

Work in progress | 0% Completed

Roof slab concrete completed

Attached images

img

Amal Padmu L P
Date: 25/10/2022

Work in progress | 0% Completed

Roof slab concrete completed

Attached images

img

Amal Padmu L P
Date: 25/10/2022

Work in progress | 0% Completed

Roof slab concrete completed

Attached images

img

Amal Padmu L P
Date: 25/10/2022

Work in progress | 0% Completed

Roof slab concrete completed

Attached images

img

Amal Padmu L P
Date: 19/10/2022

Work in progress | 0% Completed

Form work for roof slab

Attached images

img

Amal Padmu L P
Date: 19/10/2022

Work in progress | 0% Completed

Form work for roof slab

Attached images

img

Amal Padmu L P
Date: 19/10/2022

Work in progress | 0% Completed

Form work for roof slab

Attached images

img

Amal Padmu L P
Date: 19/10/2022

Work in progress | 0% Completed

Form work for roof slab

Attached images

img

Amal Padmu L P
Date: 10/10/2022

Work in progress | 0% Completed

The curing period for the columns is completed and instructed the contractor has to restart the work.

Attached images

img

Amal Padmu L P
Date: 10/10/2022

Work in progress | 0% Completed

The curing period for the columns is completed and instructed the contractor has to restart the work.

Attached images

img

Amal Padmu L P
Date: 10/10/2022

Work in progress | 0% Completed

The curing period for the columns is completed and instructed the contractor has to restart the work.

Attached images

img

Amal Padmu L P
Date: 10/10/2022

Work in progress | 0% Completed

The curing period for the columns is completed and instructed the contractor has to restart the work.

Attached images

img

Amal Padmu L P
Date: 01/10/2022

Work in progress | 0% Completed

Curing period completed for column

Attached images

img

Amal Padmu L P
Date: 01/10/2022

Work in progress | 0% Completed

Curing period completed for column

Attached images

img

Amal Padmu L P
Date: 01/10/2022

Work in progress | 0% Completed

Curing period completed for column

Attached images

img

Amal Padmu L P
Date: 01/10/2022

Work in progress | 0% Completed

Curing period completed for column

Attached images

img

Amal Padmu L P
Date: 26/09/2022

Work in progress | 0% Completed

Casting of column is completed

Attached images

img

Amal Padmu L P
Date: 26/09/2022

Work in progress | 0% Completed

Casting of column is completed

Attached images

img

Amal Padmu L P
Date: 26/09/2022

Work in progress | 0% Completed

Casting of column is completed

Attached images

img

Amal Padmu L P
Date: 26/09/2022

Work in progress | 0% Completed

Casting of column is completed

Attached images

img

Amal Padmu L P
Date: 17/09/2022

Work in progress | 0% Completed

Casting of colomn completed

Attached images

img

Amal Padmu L P
Date: 17/09/2022

Work in progress | 0% Completed

Casting of colomn completed

Attached images

img

Amal Padmu L P
Date: 17/09/2022

Work in progress | 0% Completed

Casting of colomn completed

Attached images

img

Amal Padmu L P
Date: 17/09/2022

Work in progress | 0% Completed

Casting of colomn completed

Attached images

img