Request for NOC from NHAI-Rejection letter rece3ived from NHAI

05/11/2012 | File: Doc3.doc | Download

Supplying and laying 300 mm DI Transmission main from Sreenarayanapuram to Vetturoad- (9870m .Out of this 1600m is to be laid through NH-47, between Pallippuram Jn. and Vetturoad .Permission rejected, due to non -Completion of Acquisition process in connection with widening of the NH stretch between Cherthala and Kazhakkuttom

Pwd Road Cutting Sanction -Letter to District Collector,Tvpm

05/11/2012 | File: Doc2.doc | Download

Supplying and laying 300 mm DI transmission main from Sreenarayanapuram to Vetturoad-Request for sanction forwarded to District Collector,TVPM, by The Exe: Engineer, PWD Roads Division,,Tvpm

Estimate and GAD Received from Railways

05/11/2012 | File: Doc4.doc | Download

Detailed Estimate calculating Departmental Charges to be remitted to Railways for laying pipe line across Railway track between ch:205/500-205/600

Distribution system- crossing Railway Track Near Kazhakkuttom

05/11/2012 | File: Doc1.doc | Download

GAD & Estimates forwarded by Railways for acceptance for sanctioning the pipe line crossing between Ch:205/500-205/600 near Kazhakkuttom by pushing method