| Sl.No. | Component | Description |
|---|---|---|
| 1 | Laying of DWC pipe including Excavation and refilling | Laying of DWC pipe including Excavation and refilling |
| 2 | Supplying and laying of armoured cable and copper conductor | Supplying and laying of armoured cable and copper conductor |
| 3 | Excavation of Earth for foundations | Excavation of Earth for foundations |
| 4 | RCC Form work and concreting | RCC Form work and concreting |
| 5 | Plastering and Painting works | Plastering and Painting works |
| 6 | Erection of cast iron lamp post and LED lamp top luminaire | Erection of cast iron lamp post and LED lamp top luminaire |
| 7 | Earthing with GI earth plate | Earthing with GI earth plate |
| 8 | Installation of feeder pillar | Installation of feeder pillar |