Sl.No. Component Description
1 Dismantling stones Dismantling stones
2 Tree cutting Tree cutting
3 Earthwork in Excavation Earthwork in Excavation
4 Supplying and installation of Geomat for Seawall Supplying and installation of Geomat for Seawall
5 Supplying and laying Core Layer(10-50 kg) Supplying and laying Core Layer(10-50 kg)
6 Supplying and laying Toe layer(200-400) Supplying and laying Toe layer(200-400)
7 Supplying and laying Secondary Layer(150-200 kg) Supplying and laying Secondary Layer(150-200 kg)
8 Supplying and laying Secondary layer(250-350 kg) Supplying and laying Secondary layer(250-350 kg)
9 Supplying and laying Toe Layer(350-700) Supplying and laying Toe Layer(350-700)
10 Moulding and Supplying 2T Tetrapod(0.8 cum) Moulding and Supplying 2T Tetrapod(0.8 cum)
11 Conveying and placing 2T Tetrapod(0.8 cum) Conveying and placing 2T Tetrapod(0.8 cum)
12 Moulding and supplying 3T Tetrapod(1.2 cum) Moulding and supplying 3T Tetrapod(1.2 cum)
13 Conveying and placing 3T Tetrapod(1.2 cum) Conveying and placing 3T Tetrapod(1.2 cum)
14 PCC concrete 1:4:8- Levelling course PCC concrete 1:4:8- Levelling course
15 Walkway M25 grade for RCC Walkway M25 grade for RCC
16 Walkway M30 grade Walkway M30 grade
17 Centering and shuttering Centering and shuttering
18 Reinforcement Work-HCR Fe500d or more Reinforcement Work-HCR Fe500d or more
19 DR Masonry DR Masonry
20 Filling of quarry muck Filling of quarry muck